Reduce Labor Costs, Coating Costs, and Inspection & Maintenance Costs with a Better Product!
Here’s the difference:
Paint
After the steel is clean and ready to coat:
- Prime, or paint – dry time 2 to 6 hours (Storm Greeter application is finished during the 1st two hours)
- The crew goes away for a while
- The crew comes back
- Paint – dry time 2 to 6 hours
- The crew goes away for a while
- The crew comes back
- Crew either adds another coat or they backfill
- Repeat the process in 10 to 15 years
Storm Greeter
After the steel is clean and ready to coat:
- Prime – 20 minute dry time
- Preheat – 15 to 20 minutes
- Coat and heat – 15 to 20 minutes
- Coat and heat to achieve more thickness if desired
- Continue heating to cure – 4 to 8 minutes
- Backfill
- Repeat this process in 30 to 50 years
The Difference
Storm Greeter features:
- Reduced labor by hours – maybe days – per structure
- A single setup and finish application – no return trips
- Competitive pricing and lasts decades longer, even in the worst environments
The Requirements
- Equipment is available off the shelf
- On-site training and certification
- Storm Greeter coating – 5 gallon buckets to 250 gallon totes. We’ll work with you and the size of your project!